banner

Company

Cluster layout, focusing on marine

Who We Are

Yada Green Energy Solutions Co., Ltd. was established in 1993, which provides full lifecycle services to customers including basic design, stress analysis, detail design, components manufacturing, spool prefabrication, skids integration, installation, safety monitoring, operation and maintenance. It's service scope covers liquid cargo system solution(chemical tanker, LEG, LPG, LNG carrier), dual-fuel supply system turnkey solution (LNG, methanol,ammonia, and hydrogen), modules and skids production solution, pump tower solution, double-wall pipe solution,and heating coil system.

Yada's workshop covers an area of 100,000 square meters and there are 12 production lines including welded pipes, seamless pipes, pipe fittings, flanges, prefabricated pipes, heating coils, double-wall pipes, pressure vessels,outfitting parts, pump towers, and modules, with an annual production capacity of 60,000 tons.Yada has been recognized in six major industries including shipbuilding, offshore engineering, nuclear power,petrochemical, etc.,and has 39 international certifications including nine major classification societies such as LR, ABS, DNV, BV, CCS,RS, NK, RINA, KR, as well as ASME, NORSOK-M650, API-6A, food-grade approval, etc.

about
  • 60,000+

    Tons annual capacity

  • 39

    Production lines

  • 12

    Production lines

  • 100,000+

    Square meter of professional production base

History

Looking back on the past 30 years,
YADA has always adhered to technology research and development as the guide, quality as the guarantee, to provide quality service as the core, and to rely on the society, to build a strong enterprise and build an international brand.

circle
01

ESTABLISHMENT

circle

1993

YADA was established and started to produce stainless steel pipe accessories
circle

2003

Produce flange product and expand the category of secondary manufacturing
circle

2009

Extended to the tertiary manufacturing, producing prefabricated products
circle

2010

Entered the LNG industry
circle

2013

Extending upwards to primary manufacturing, producing seamless steel pipes
circle

2014

Realized the first localization of double wall pipe products
circle

2015

Expanded quaternary manufacturing, producing unit skids
circle

2019

The FGSS was successfully developed and obtained AiP Certificate from Classification Society
circle

2023

Expand the service capacity of LFSS (methanol)
30

Thirty years of
trials and hardships

Culture

The LOGO of YADA is a circle with a missing corner as the overall outline,which means that YADA people uphold the idea that there is no best, only better and continuous improvement, and make unremitting efforts to provide customers with quality service.

Culture

With advanced technology, excellent quality and perfect service system, YADA has been rated as the national high-tech enterprise,Zhejiang Enterprise Technology Center, Zhejiang Enterprise Research Institute, Zhejiang Industrial Design Center, provincial high-tech enterprise Research and development Center and many other honors. YADA is qualified supplier of China National Nuclear Corporation, Sinopec, petrochina, CNOOC, CSSC, Maersk, CMA CGM, MSC, Seaspan, COSCO, MOL Wartsila and other well-known companies at home and abroad. In 2019, YADA obtained DNV Classification and AiP Classification of FGSS, became the first domestic enterprise with high pressure gas system recognition.

CIMC Raffles 2014 Supplier Conference,

Best Quality Award

2016 Asia FPSO&FLNG Conference

Annual Excellent Pipeline System Solution Supplier Award

Key projects for winter supply guarantee in 2018, Guangdong Zhuhai LNG Liquid Export Facility Expansion Project,

Pioneering Merit Award

Best Supplier

Best Supplier

CIMC Raffles 2014 Supplier Conference,

Best Quality Award

2016 Asia FPSO&FLNG Conference

Annual Excellent Pipeline System Solution Supplier Award

Key projects for winter supply guarantee in 2018, Guangdong Zhuhai LNG Liquid Export Facility Expansion Project,

Pioneering Merit Award

The first phase of the Zhuhai LNG project,

Best Supplier